Our parking lot is completely finished with stripes and all.
|
This is showing the masonry prior to its completion, this is finished as well.
|
|
|
|
This is the front of the building but to the left of the front doors. The door you see there is the fire equipment as well as our outside access to water and such. Basically a utility room.
|
This is the West side of the building. You can see that the wainscoat is finished all the way around.
|
This is the North side of the building. As i said the masonry work is now finished. In this picture we only had the concrete borders down.
|
|
|
|
This is the East entrance. That large area is now all covered with the masonry work.
|
|
|
This is the front entrance area.
|
You are looking at the janitor closet which now has two sinks (one low mop sink and a higher up work sink), it also has the hot water heater in it. To the left and right of this room are the men's and women's bathrooms.
|
Pastor Pat was finishing up the tiling in the men's bathroom.
|
|
|
I was trying to show the glow of the light but lost the fixture in the process. The next picture show the fixture better.
|
As you could tell in the previous picture, the glass on the fixture is not actually gray but an amber color that goes very nicely with the rest of the accents.
|
|
|
This is the light fixtures that are in the offices.
|
|
Thats a more accurate picture of the coloring with the light on.
|
This is the men's restroom prior to the partitions going up. Those are now up and finished.
|
There are also some wood dividers in between these now as well.
|
The mosaic in both bathrooms still needs to be grouted but other than that they are completed.
|
All handrails, toiletpaper roll holders and seat protector holders are up as well.
|
|
|
|
This is the women's bathroom. We have mirrors and such that will be going in here as well.
|
The roof access. We have another in the hallway.
|
This is the motion detector. The lights in the bathrooms are on sensors so they go off after 15 minutes and come up when someone walks in. Nice and sanitary for a restroom.
|
|
I was trying to get the partition coloring but it was difficult.
|
|
|
These are pretty much done and ready in the women's restroom as well. We aren't using them yet though so I am not sure if there is some more plumbing that needs to be done, but I have heard them flush.
|
|
Drinking fountains! YAY! They will be tiling around this as well to protect the wall from the water splash. I believe it is the waterproof drywall as well behind that.
|
Our Pastor, the Jack of all trades!
|
|
|
The doors are all stained and ready.
|
As you can see we have the dropped ceilings done is all the classrooms. All the ventwork and lights are nearly finished.
|
|
|
|
We have wainscoating on all the hallways and these are the moldings to top it off. They are all installed now and look beautiful. I think I have pictures of this later.
|
|
Danny, Painter Extraordinaire!
|
This is the two classrooms near the fellowship hall (the rest are in the hallway by the sanctuary). The doors between those rooms will be opened for potlucks and we will use these rooms for grub! YUM!
|
The ceiling in the fellowship hall is now dropped with working lights.
|
This was up but they took it down again, I'm not sure why. I know that the kitchen may be finished later so that might be the reasoning behind it.
|
|
Light fixtures in the Sanctuary. Gorgeous!
|
This is the sanctuary, looking into the fellowship hall.
|
In the sanctuary, looking into the hallway.
|
|
|
That dove is huge! It doesn't look it when you are in there but its 6'x6'
|
We no longer needed the handrail for ADA because the stage is classified as a platform and therefore does not require a handrail right there.
|
That box is what you open to hook up your lines for instruments and mics.
|
The gorgeous dove in the sanctuary.
|
The wheelchair lift. This is one of the rooms off to the right of the platform.
|
Light switches are in all the rooms now (I believe, I can't think of a spot where they aren't).
|
Nearly all the electrical outlets are in.
|
This is the room off to the left of the platform. It will be a utility room for some of the sound hardware and such.
|
Underneath the platform. We have lights in there. We have to put a sprinkler system under there in order to use it as storage. That isn't in yet but that will go in soon.
|
|
|
Pastor Pat's bathroom. It is actually finished now. Completely sealed, glossed and all that.
|
|
|
Pastor Pat's ceiling. It now has all the light fixtures in place.
|
Pastor Pat's office. You will see in later pictures we bordered it with the same tiles that are in his bathroom.
|
Bri's office ceiling is also done with all light fixtures in.
|
Here you can see the wainscoat in the hallway. This now has molding on the top and bottom.
|
The children's bathroom. It has a toilet installed now. One of those short little ones for kids.
|
|
There will be a door that covers this area. It is the telephone access.
|
The roof access stairs are now all working, we no longer need the ladders!
|
The classrooms are all carpeted now. Pictures later.
|
This door will lock.
|
This is the door for the nursury.
|
We won't be keeping this in here but it has been really handy on Saturday work days!!!
|
This is the cry/prayer/bookstore room. It has access to the sanctuary.
|
|
There's the molding!!! That is the window to Bri's office.
|
Molding is up!
|
The tile border in Pastor Pat's office.
|
|
The threshold from Pastor Pat's office to his bathroom.
|
We have carpet!!! We put the plastic down to protect it.
|
The children's bathroom.
|
More carpet and doors!
|
|
|
|
|
|
The sound booth is carpeted as well.
|
Our light board.
|
This is the sound booth. You can see the equipment of the new sound board there, and some other stuff that I don't understand. The new sound board will help a lot since our current one has several bad channels and is just slowly dying on us.
|
The other side of the sound booth. This little nook will have a computer.
|
More sound equipment came in. We have been in dire need of replacing a lot of our stuff. We have more stuff on our wish list for the future but this will get us started with cables and speakers that work properly.
|
Todd our wonderful carpenter guy!
|
|
|
The rooms off of the platform are carpeted as well.
|
These are the classrooms off of the fellowship hall. They are carpeted as well.
|
The janitor's closet has more stuff in it!
|
|
|
Partictians are up here as well.
|
|
This is Chris' office but the vanity is going in Pastor Pat's bathroom.
|
|